Can You Remove a Wall in NYC Without a Permit?
NYC DOB rule 1 RCNY 101-14 lets you remove small non-load-bearing, non-fire-rated partitions without a permit. The limits for homes and businesses, and the exceptions.
DOB permits, building and board approvals, and licensing in New York.
NYC DOB rule 1 RCNY 101-14 lets you remove small non-load-bearing, non-fire-rated partitions without a permit. The limits for homes and businesses, and the exceptions.
Construction in NYC before 7 a.m., after 6 p.m., or on weekends needs a DOB After Hours Variance. When you need one, when to file, and how it affects your schedule.
What NYC co-op and condo alteration agreements typically require — plan review, insurance, deposits, indemnification, work hours, lien rules — and how to get approved faster.
DOB lists painting, plastering, new cabinets, fixture replacement, floor resurfacing, and non-structural roof repair as permit-exempt. Structural, exit, plumbing, and electrical work needs filings by licensed professionals.